BHEL HARIDWAR SUMMER TRAINING REPORT BLOCK 3 PDF

Summer Training Presentation of BHEL Block Limited Ranipur, Haridwar ( Uttrakhand) Submitted To: Mr. XYZ Submitted By: ABC Roll No. Who give me lot of inspiration and skills to complete this Report successfully. Training Report on Manufacturing of Turbo Generator at BHEL Haridwar .. BLOCK-2 Fabrication (Steam, Hydro & gas Turbine) iii. .. 34 CONCLUSION We have undertaken summer training in Bharat Heavy Electricals Limited, Haridwar. View Test Prep – from MECHANICAL I thankfully acknowledge the staff of BHEL, Haridwar for giving me so much co- (Sr. Manager,TUM Block-3) to support me during my Industrial Training. . I cannot even describe how much Course Hero helped me this summer.

Author: Meztishicage Moogugar
Country: Yemen
Language: English (Spanish)
Genre: Medical
Published (Last): 12 February 2017
Pages: 393
PDF File Size: 9.86 Mb
ePub File Size: 18.69 Mb
ISBN: 538-2-76090-692-8
Downloads: 31944
Price: Free* [*Free Regsitration Required]
Uploader: Mulkis

Core is stacked with lamination segments. The natural frequency of the stator body is well away from any of exiting frequencies. Test procedure for capacitance measurement of stator winding. Under this collaboration agreement BHEL has established strong design manufacturing relort servicing base for units up to MW ratings. BHEL has covered up many power stations over 40 countries worldwide. Enter the email address you signed up with and we’ll email you a reset link. These RTDs are monitored temperature scanner in the control panel and if the temperature exceeds the prescribe limit.

To prevent the potential difference and possible corona discharges between the insulation and the slot wall, the section of bars are provided with outer corona protection.

The company is a major producer of large-size thyristor devices. In the case of a steam turbine, the pressure and flow of newly condensed steam rapidly turns the rotor. To minimize the effect of radial forces windings hold and insulated rings are used to support the overhang.

  KEANEKARAGAMAN PTERIDOPHYTA PDF

To ensure that core summwr are within limits and there are no hot spots present in the core. The system is capable of performing following system — 1. But the temperature must not be allowed to become too high, otherwise difficulties will be experienced with insulation.

For electricity generation, it is known as power turbine. Threaded root fastenings permit angle to be changed. Stator winding is done by placing stator on rotating installation. As compared to electrolytic copper silver alloyed copper features high strength properties at high temperature so that coil deformations due to thermal stresses are eliminated. Amorphous silicon solar cell plant. These are provided with STDP, totally enclosed and duct ventilated enclosures.

To ensure that a high quality product is obtained, bblock of material analysis and ultrasonic are performed during the manufacturing rotor.

BHEL is engaged in the design, engineering, manufacture, construction, testing, commissioning and servicing of a wide range of haridwr and services for the core sectors of the economy, viz. HEEP plant is divided into 8 blocks.

It gave us exposure of the practical implementation of theoretical fundamentals. My presentations Profile Feedback Log out. The aim of establishment BHEL was to meet the growing power requirement of the country.

Training Report on Manufacturing of Turbo Generator at BHEL Haridwar | Hitesh Gupta –

Metering and supervisory equipment. Stator houses the armature winding. This procedure is for high voltage test on stator winding of turbo generator. At the transition from the slot to the end winding portion of the stator winding portion of stator bars a semiconductor tape feport up old polyester fluce is impregnated. Embarking upon the 50th Golden Year of its journey of engineering excellence, BHEL is an integrated power plant ssummer manufacturer and one of the largest engineering and manufacturing company of its kind in India engaged in the design, engineering, manufacture, construction, testing, commissioning and servicing of a wide range of products and services for the core sectors of the economy, viz.

  BS EN 12079-2 PDF

The pressed core is held in pressed condition by means of two massive non-magnetic steel castings of press ring. Segments are assembled in an interleaved manner hariewar layer to layer for uniform permeability.

Several half overlapped continuous layer of resin poor mica tape are applied over the bars. Urban transportation systems iii. The most beautiful feature is of this type of exciter is that is automatically divides the magnitude of hariewar to be circulated in rotor circuit.

INDUSTRIAL TRAINING AT BHEL, HARIDWAR – ppt video online download

Hydro Power Plant ix. About project SlidePlayer Terms of Service.

The enthalpy of the steam decreases. AC voltmeter75, 3. A feedback path is given to this system which compares theoretical value to predetermine and then it sends the current to rotor as per requirement. The pilot exciter is a PMG permanent magnet generator.

Bhel Haridwar training ppt

Filing in and purging of hydrogen safety without bringing in blcok with air. Two individual conductors placed-one over the other are bent to obtain half turns. The company has been earning profits continuously since and paying dividend since